Áridos de Melo obtains the certificate of conformity of factory production control

09/06/2016

Áridos de Melo obtains the certificate of conformity of factory production control

Áridos de Melo obtains the certificate of conformity of factory production control

In February, Áridos de Melo obtained the certificate of conformity of factory production control 1377/CPR/MB-0025-2 for its bituminous hot mixtures

 

  • AC 32 BASE 50/70 G
  • AC 22 BASE 50/70 G
  • AC 22 BIN 50/70 S
  • AC 16 SURF 50/70 S (Sílice)
  • AC 16 SURF 50/70 S (Porphyry)
  • AC 16 SURF 50/70 D
  • BBTM 11 A 45/80-60 C F